Lubumbashi Water Supply Project

Completion date: Aug. 2015
Project Introduction:
 The project is located in Lubumbashi, Demoncratic Republic of Congo, and the project is financed by the World Bank. The project includes four new pumping stations, renovation of three existing pumping stations, 11 new drilling wells, the new main pipeline 62,395 meters, second-level and third-level pipes 204,264 meters, supplying water to 12,426 households, 100 four-head public water points, installing 10 sets transformer control cabinets and setting up 8m medium-voltage cable.
Delivery Method: General construction contracting